FTRC
Request Consultation →
Projects

Where The Stakes Were High. We Delivered.

Selected case studies. Each project followed the same operating standard — preventive planning, listed equipment, continuous inspection, lean execution.

Judiciary Office Complex
Government / Infrastructure

Judiciary Office Complex

Dodoma, Tanzania
Problem

12-storey judicial facility required code-compliant detection and gaseous suppression for sensitive archive and server rooms — under aggressive ministerial deadline.

Solution

Addressable alarm loop integrated with FM200 protection in 8 critical zones; voice evacuation across all floors; full BMS interface; commissioned with authority sign-off.

Result

Delivered 11 days ahead of schedule. Zero rework on commissioning. Passed first-time authority inspection across all zones.

1,280
Detectors
8
FM200 zones
24
Voice zones
−11 days
Schedule
Sosian Menengai Geothermal
Industrial / Energy

Sosian Menengai Geothermal

Nakuru, Kenya
Problem

35MW geothermal plant required hydrant network, foam suppression for transformer bays, and a redundant pump skid capable of operating during grid outages.

Solution

Diesel + electric pump skid (UL/FM listed), 2.4km hydrant ring main, foam-water deluge system over transformer yards, and full SCADA integration.

Result

Plant commissioned on schedule. Insurance premium reduced 18% post-installation due to compliant fire infrastructure.

2,500 GPM
Pump capacity
2.4 km
Hydrant ring
6
Foam zones
−18%
Insurance Δ
Novotel Kinshasa
Hospitality

Novotel Kinshasa

Kinshasa, DRC
Problem

International-brand hotel needed sprinkler coverage across 240 keys, kitchen suppression for 4 commercial kitchens, and voice evacuation meeting brand-standard SLAs.

Solution

Wet sprinkler network with pre-action coverage in archives, UL 300 wet-chemical kitchen systems, addressable alarm with multi-language voice evac, gas-shutoff interlocks.

Result

Brand-standard pre-opening fire audit passed first attempt. Zero deficiency findings.

3,400
Sprinklers
12
Kitchen hoods
18
Voice zones
0
Audit findings

Have a project that cannot afford to fail?

Brief our team